
Waterproofing Membrane HDPE Sheet of Building Protect Materials
Pre-applied, Fully Bonded HDPE Waterproof Membrane DescriptionMulti-layer composite: high density polyethylene (HDPE) fi
Send your inquiryDESCRIPTION
Basic Info.
Thickness | 1.2mm, 1.5mm or Customized |
Ceiling Tile Type | HDPE |
Surface Treatment | Film Coated |
Function | Waterproof |
Certification | ISO, MSDS, ASTM |
Color | White |
Usage | Outdoor, Indoor |
Classification | with Sand/Self-Adhesive |
Transport Package | Roll |
Specification | forty square meters/roll |
Origin | China |
Production Capacity | 10000000 Square Meters |
Product Description
Pre-applied, Fully Bonded HDPE Waterproof MembraneDescriptionMulti-layer composite: high density polyethylene (HDPE) film, high polymer adhesive layer, and unique process reaction-type inorganic polymer particle;High-quality raw material: with high density polyethylene resin as the raw material, mixing inhibitor, antioxidant, UV absorbent, stabilizer and other functional materials, and adopting international advanced injection molding and rubber mixing technology.High adhesive strength: adopting macro-molecular binding material and pre-processing quartz material for strong adhesive strength with concrete.Feature1. Forms permanent bond to concrete poured against it, preventing water from seeping into the gap between waterproofing membrane and the structure2. Not affected by the displacement of the basal layer/ ground settlement beneath slabs3. Membrane is self-protecting. It can be trafficked immediately after application and does not require the use of protective layer4. Simple and quick to install, requiring no priming or fillets5. Unaffected by wet conditions6. Fully-adhered watertight laps and detailing7. Excellent bonding even under long-term water immersionBenefit1. Forms long-last bond to concrete, preventing water from seeping into the gap between waterproofing membrane and substrate
2. Not affected by the displacement of the basal layer/ground settlement beneath slabs3. Sand layer makes it possible to construct and work on membrane after applied without protective layer4. Simple construction process5. Membrane can be applied at -4ºC and above6. Unaffected by wet conditions7. Fully-adhered watertight laps and detailing8. Excellent bonding even under long-term water immersion
Main Application 1. Waterproofing below ground concrete structures2. Protection of concrete foundations against aggressive ground contaminants3.Prevents methane leakage in underground layers
Technical Data Sheet
No. | Test Item | Test Method | Result | Conclusion | |
1 | Peel Strength | ASTM D903-98(2017) | 0.201kgf/mm | Pass | |
2 | Puncture Resistance | ASTM E154/E154M-08a(2013)Section 10 | 995N | Pass | |
3 | Tear Strength | ASTM D624-00(2012) | Transverse | 77.1kN/m | Pass |
Lengthways | 77.6kN/m | ||||
4 | Tensile Strength | ASTM D882-12 | Transverse | 24.5Mpa | Pass |
Lengthways | 24.7Mpa | ||||
Elongation at break | Transverse | 940% | Pass | ||
Lengthways | 930% | ||||
5 | Tensile Strength | ASTM D412-16Method A | Transverse | 25.6Mpa | Pass |
Lengthways | 26.2Mpa | ||||
Elongation at break | Transverse | 860% | |||
Lengthways | 800% | ||||
6 | T-Peel Strength | With reference to ASTM D1876-08(2015) and client's requirement | 0.541 N/mm | Pass | |
7 | Water Absorption | ASTM D570-98(2010) | 0.29% | Pass | |
8 | Low Temperature Flexibility | ASTM D1790/D1790M-15 Section 7.6 | No affection | Pass |
Supply
Product name | Width | HDPE thickness | Membrane thickness |
Pre-applied, Fully Bonded | 1m/2m | 0.8mm | 1.2mm |
HDPE Waterproof Membrane (With Sand) | 1m/2m | 1.0mm | 1.5mm |
Application InstructionThe membrane should be overlapped using steel roller to ensure complete bonding and to achieve continuity. It can be installed at temperatures of -5ºC and above. When installing it in cold weather, care should be taken to preheat the bonding edge with appropriate means such as hot air gun or other similar means.PrecautionAfter the complement of the waterproof course, pay attention to protect the course and avoid the damage. During the construction and before the acceptance of the project, all the personnel are prohibited to walk above the waterproof course wearing spike.